The J. Craig Venter Science Foundation Joint Technology Center
Rockville, Maryland Project Value: $1.5 Million
General Contractor Burr Computer Environments, Inc.
This was a fast track design/build project consisting of the installation of one (1) 4000 Ampere Bolted Pressure Service Switch, one (1) 4000 Ampere Switchboard, one (1) 2000 KW Generator, one (1) 3000 Ampere Emergency Switchboard, four (4) Automatic Transfer Switches, and three (3) 500 KVA UPS Systems. The buildout consisted of a 5,000 Square foot Data Center, a 12,000 square foot Sequencing Facility, 20,000 square feet of Lab Space, and 10,000 square feet of Office Space. The Sequencing Facility is shown in the picture.
|